The performance of reliable and unreliable unpaced production lines with unequal operation time means, variabilities and buffer capacities

McNamara, Thomas (2009). The performance of reliable and unreliable unpaced production lines with unequal operation time means, variabilities and buffer capacities. PhD thesis The Open University.

DOI: https://doi.org/10.21954/ou.ro.000100b8

Viewing alternatives

Metrics

Public Attention

Altmetrics from Altmetric

Number of Citations

Citations from Dimensions

Item Actions

Export

About